Lake Travis High School Improvements

  •  

    Detailed descriptions of each component:

    Technology: replacement of systems reaching end of life by 2017 including computer and peripheral equipment, audiovisual equipment, network infrastructure equipment, telephone and PA/bell/clock/broadcast communication systems, and safety and security systems

    Instructional Materials and Equipment: purchase of library books, textbooks not funded by the state, and fine arts/extracurricular uniforms and equipment; replacement of worn instructional materials and science equipment

    Maintenance: replacement of building interior finishes, mechanical/air conditioning equipment, and original outside doors and window lintels; maintenance of paving, drainage, irrigation and water quality pond; installation of water well for irrigation; upgrade of safety, lighting and electrical systems, site signage and marquee message board, and health science technology equipment; recapture classroom space by constructing new space for technology department (construction cost is included in district-wide technology below, and related costs are included here).

    Fire Sprinkler Additions: installation of fire sprinkler system in the original construction areas of the main building

    Wastewater Service Impact Fees: additional impact fees are required due to campus growth

     

Lake Travis High School Expansion (Annex)

  •  

    Detailed descriptions of each component:

    Construction & Related Costs: Costs include fees, permits, furniture and equipment 

    Technology: replacement of systems reaching end of life by 2017 including computer and peripheral equipment, audiovisual equipment, network infrastructure equipment, telephone and PA/bell/clock/broadcast communication systems, and safety and security systems; equip new instructional areas

    Instructional Materials and Equipment: purchase of library books, textbooks not funded by the state, and fine arts/extracurricular uniforms and equipment; replace worn instructional materials and science equipment

    Maintenance: replacement of remaining roof from 2007 windstorm, building interior finishes, mechanical/air conditioning equipment,original outside doors, auditorium dimmer and sound system, cafeteria sound system, classroom blinds, courtyard benches and trash cans, and site signage; maintenance of paving, drainage, irrigation and water quality pond; upgrade of safety, lighting, plumbing and electrical systems

    Fire Sprinkler Additions: installation of fire sprinkler system in the original construction areas of the main building

    Wastewater Service Impact Fees: additional impact fees are required due to campus growth